NAVERQIO

Huila Due — 2 Group

265.000,00 Kč

Tax included where applicable. Delivery and installation arranged by your concierge.

Commissioned, not courieredDelivered, installed and dialled in by our own crew.
Two years, honestlyParts and labour EU-wide; parts stocked for fifteen.
Water firstBench-tested on your water report before dispatch.

NAVERQIO Machines — nine bars, held steady

Most bars are won or lost at the two-group. The Huila Due holds temperature through the rush, gives baristas override when a shot deserves it, and comes with our crew's installation, water treatment and training as standard.

We build espresso machines the way boiler-makers used to: thick copper and stainless, brass groups machined in-house, silicone-free food-grade seals, and wiring looms labelled so a technician in ten years thanks us by name. Panels come off with a single tool; nothing structural is glued; every fastener is stainless and standard.

Design & Craft

  • Boilers in copper or 316L stainless, insulated and TIG-welded by hand
  • Solid brass groups machined in-house and pressure-tested twice
  • Two years parts and labour; parts stocked for fifteen
  • Panels remove with one tool — built to be serviced, not replaced
  • Saturated or thermosyphon groups that shrug off the morning rush
  • Independent group temperatures for a multi-coffee menu

Specifications

Format Standard
Groups Two, independent PID
Boiler 11–14 L steam + dual brew circuits
Power 230 V dedicated or 400 V per site
Steam Two cool-touch wands
Weight ≈ 74.1 kg
Certification Commercial use, CZ/EU

Care

Daily: flush groups, brush the screens, purge and wipe wands. Weekly: detergent backflush and basket soak. Yearly: gaskets, shower screens and a NAVERQIO health check. Machines fed with treated water and honest cleaning run for decades — ours are built expecting it.

Questions, Answered

What water should I use?
Softened, remineralised water around 40–80 ppm hardness. Send us your water report before dispatch and we bench-test the machine on a matching profile — it is part of the NAVERQIO standard.

Tank or plumbed?
Machines listed as plumbable ship with both options where the platform allows; our installation includes connection to treated water and a drain if they are within reach of the bench.

The NAVERQIO Promise

Every NAVERQIO machine leaves Prague bench-tested on the water profile of its destination — send us your water report and it ships dialled in, with the test shots' numbers in the box.